00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

Just – in – time
two stages production systems
sub-assembley
containers
work-in-process

6. variance
wastes
just In time
lot
multi-Stage production system
pull systems
succeeding stage
preceding stage
production lead time
feed back
Kanban
line
Production ordering kanban
Post
Withdrawal kanban
-51818-2999516

home stage
Conveyance kanban
sequencing
Shortest Processing Time
First- Come, First-Served
12193222907

28 . utilization
11. push systems

22. cycle
Schroer, B.,”Microcomputer Analyzes 2-card Kanban System For ‘Just-In-Time’ Smal Batch Production,” IE. vol.10, PP. 25-40, 1984.
Kimura, 0., and Tereda, H., “Design and Analysis of
Pull System: A Method of Multi-stage Production Control,” Intemational Journal of production Research, vol. 19, PP. 241-253, 1981.
Huang, P. Y., Rees, L. P., and Taylor 111, B. W., “A
Simulation Analysis of the Japanese Just-in-time
Technique(with kanbans) for a Multi-line, Multi-stage Production System, “Decision Sciences, vol. 14, PP. 326-343, 1983.
Monden, Y., Toyota Production System, Industrial Engineering and Management Press, Atlanta, 1993.
Pritsker, A. A. B., and Pegden, C. D., Introduction to Simulation and SLAM 11, Halsted press, West Lafayette, Indiana.

Krajewski, L. J., King, B. E., Ritzman, L.P., and Wong, D. S.,”Kanban, MRP, and Shaping the Manufacturing Environment,” Management Science, vol. 33, PP. 39-57, 1987.
Fallon, D., and Browne,

JIT Systems,” International

Joumal of Operations and Production
nevi/

Management, vol. 8, PP. 30-45, 1987.
Lee. L. C.,ttA Comparative Study of the Push and

Pull Production Systems,”lntemational Joumal of Operations and Production Management, Vol. 9, PP.

5-19, 1989.
Berkley, B. J., and Kiran, A. S.,”A Simulation Study of Sequencing Rules in a Kanban Controlled Flow Shop,” Decision Sciences, Vol. 22, PP. 559-582, 1991.
Sarker, B. R., and Harris, R. D.,’The Effect of Imbalance in a JIT Production System: a Simulation Study,” Intemational Joumal of Production Research, Vol. 26, PP. 1-18, 1988.
Gupta, Y.P., and Gupta, M. C,” A System Dyna
-mics Model for a Multi-stage Multi-line Dual-card JIT Kanban system,” Intemational Joumal of

Production Research, vol. 27, PP. 309-352, 1989.
Villeda, R., Dudek, R., and smith, M. L., “Increasing the production Rate of a JIT Production System With Variable Operation Time,” International Joumal of Production Research, vol. 26, PP. 1749-1768, 1988

Chaturvedi, M., and Golhar, D. Y.,”Simulation Modelling and Analysis of a JIT Production System,” Production Planning and Control, Vol. 3, PP. 81-92, 1992.
Lee, L. C.,”Parametric Appraisal of the JIT System, “International Joumal of Production Research, Vol.
25, PP. 1415-1429, 1987.
Rees, L. P., Huang, P. Y., and Taylor 111, B.

Comparative Analysis of an MRP Lot-for-lot
System and a Kanban System for a Multistage

Production Operation,”lnternational Joumal of Production Research, vol. 27, PP. 1427-1443, 1989.
50752619781961

Philipoon, P. R., Rees L. P., Taylor 111, B.w., and Huang, P. Y.,t’An Investigation of the Factors Influencing the Number of Kanbans Required in the Implementation of the JIT,” Intemational joumal of productiopn Research, Vol. 25, PP. 457-472, 1987.
Gravel, M., and Price, W. the Kanban in

a Job Shop Environment,” Intemational Joumal of

Production Research, vol. 26, PP. 1105-1118 , 1988.
Sarker, B. R., and Fitzsimmons, J. A.,”The Per -formance of Push and Pull Systems: a Simulation and Comparative Study,” International Journal of Production Research , vol. 27., PP. 1715-1731, 1989. 19. Andijani, A A, and Clark, G.

All

All

-ocation to Serial production Lines in a Stochastic Environment. In: JIT Manufacturing Systems: Operational Planning and Control Issues,” A. Satir (ed.)(Amsterdam: Elsevier), 175-190, 1991.
Sumichrast, R. T., Russell, R. S., and Taylor Ill B. W.,”A Comparative Analysis of Sequencing Proce -dures for Mixed Model Assembly Lines in a JIT

Production System,” International Joumal of Production Research, vol. 30, PP. 199-214, 1992.

Yavuz, I. H., and Satir, A., “A Kanban – based

Simulation Study of a Mixed Model Just-in-time Manufacturing Line,” International Journal of

Production Research, vol. 33, PP. 1027-1048, 1995.

Ebrahimpour, Me, and Fathi, B. M.,”Dynamic Simulation of a Kanban Production Inventory System,” Intemational Journal of Operations and Production Management, Vol. 5, PP. 5-14, 1985.
Conway, R.W,”Some Tactical Problems in Digital Simulation,” Management Science, Vol. 19, PP. 25-369, 1963.
Fishman, G.S.,”A Study of Bias Considration in Simulation Experiments,” Operation Research VOI. 20, PP. 4-25, 1972.



قیمت: تومان


پاسخ دهید