014T….IS50

1. Simulated Annealing 3. basic period
2. Economic Lot Scheduling 4. independent solution
Problem
Roger, J., “A Computational Approach to the Economic Lot Scheduling Problem,” Management Science, 4, pp. 264-291, 1958.
8321603775

Elmaghraby, Economic Lot Scheduling Problem Review and Extensions, Management Science, 24(16), pp. 586-598, 1978.
Hsu, On the General Feasibility Test for

Scheduling Lot Sizes for Several Products on One Machine,” Management Science, 29, pp. 93-105, 1983.
Axsater, S., “An Extended Basic Period Approach for Economic Lot Scheduling Problems,” working paper, Department of Production Economics, Linkoping Institute of Techn010U, 1983.
Davis, S. G.,t’ An Improved Algorithm for Solving the Economic Lot Size Problem,” Intemational Journal of Production Research, 33(4), pp.

1007-1026, 1995.
Maxwell, W. L., “The Scheduling of Economic Lot Sizes,” Naval Res. Logist. Quart. 11, pp. 89-124, 1964.
Dobson, G.,”The Economic Lot-Scheduling

problem: Achieving Feasibility Using Time-Varying Lot Sizes,” Operation Research, 35 (5), pp. 764-771, 1985.
Gallego, G., “The Extended Economic Lot

Scheduling Problem,” Technical Report 769,
School of Operations Research and Industrial Engineering. Cornell University, Ithaca, N.Y. 1988. 9. Kirkpatrick, S., Gelatt, D.D. JR., and Vecchi, M. P.,” Optimization by Simulated Annealing,” Management Science, 220, pp. 671-680. 1983.
Johnson, D. S., Aragon, C. R., McGeogh, L. A., and Schevon, Optimization by Simulated Annealing: an Experimentation Evaluation,” Part 1, Graph Partitioning, Operations Research, 37, pp. 865-891. 1989.
Bomberger, E., “A Dynamic Programming

Approach to a Lot Size Scheduling Problem,” Management Science, 12(11), 1966.
Parson, R., Mutiproduct Lot Size Determination When Certain Restrictions Are Active,” Joumal of Industrial Engineering, 17(7), pp. 360-363, 1966.